Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home4/ismailhamdy/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the twentysixteen domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home4/ismailhamdy/public_html/wp-includes/functions.php on line 6131
Energy savings: Case studies from Ezz and Sidpec companies – IEE
Deprecated: Function WP_Dependencies->add_data() was called with an argument that is deprecated since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home4/ismailhamdy/public_html/wp-includes/functions.php on line 6131

Deprecated: Function WP_Dependencies->add_data() was called with an argument that is deprecated since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home4/ismailhamdy/public_html/wp-includes/functions.php on line 6131

Deprecated: Function WP_Dependencies->add_data() was called with an argument that is deprecated since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home4/ismailhamdy/public_html/wp-includes/functions.php on line 6131

Deprecated: Function WP_Dependencies->add_data() was called with an argument that is deprecated since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home4/ismailhamdy/public_html/wp-includes/functions.php on line 6131

Energy savings: Case studies from Ezz and Sidpec companies

Under a pressuring energy situation in Egypt with rising energy costs and insecurity of supply, it was clear to Sidi Kerir Petrochimicals (Sidpec) and Al Ezz Dekheila Steel Company (EZDK) companies’ top management that a serious commitment to improving their energy performance to reduce their overall costs is the way out. Thus, concrete steps have been taken to adopt an EnMS that is compliant with ISO 50001. In order to introduce a structured approach to energy management in their operations, Sidpec and EZDK companies have joined hands with the IEE project. The project has supported Sidpec and EZDK in the implementation of an Energy Management System (EnMS) compliant with ISO 50001 aiming to improve the company’s Energy Efficiency (EE) performance and reduce their environmental impact.

With UNIDO’s support, Sidpec and EZDK staff were engaged in a process to implement an EnMS compliant with ISO 50001 starting with securing management commitment till third party auditing and certification. The implementation of the EnMS has proven to be both easy and cost effective giving a strong management commitment and the availability of adequate resources.

EZDK Company was able to save about 815,000 MWh equivalent to about 128 Million EGP with a total investment of about 43 Million EGP While Sidpec saved 39,100 MWh equivalent to 7.7 million EGP with a total investment of 180,000 EGP. This clearly highlights UNIDO’s mandate which ensure inclusive and sustainable industrial development and support industries in developing and emerging economies in promoting cost efficiencies and competitiveness in industry.

You can view and download EZDK and Sidpec case studies from the IEE Egypt website: www.ieeegypt.org

Leave a Reply

Your email address will not be published. Required fields are marked *